Vessel Info Tech

Loading

Success

Harmony Yungang – Docking and PMS

Harmony Yungang.  Ship characteristics

  • Ship type: Ro-ro / Ferry

Project details

  • Ship network infrastructure
  • System implementation
  • System maintenance
  • System integration and upgrading
  • Ticketing system and website
  • Others

MV Oriental Dragon – Drocking

MV Oriental Dragon, Ship characteristics

  • Tonnage: 18455 GRT
  • Length: 171.70m
  • Beam: 24m
  • Capacity: 882 passengers and 350 crew.

Project details.

  • Satellite communication
  • IP phone deployment
  • Satellite TV and VOD
  • Network infrastructure
  • Ship property management system
  • Casino entertainment system
  • System maintenance after shiop operation

Ocean Grand RoRo Ferry – Docking

MV Ocean Grand, Ship characteristics

  • Ship type: Ro-ro / Ferry
  • Tonnage: 30413 GRT
  • Length: 193m
  • Beam: 29.50m
  • Capacity:

Project details

  • Build up server room
  • Rebuild the network infrastructure
  • WiFi deployment
  • Satellite communication
  • CCTV Surveillance system
  • Casino system deployment
  • System maintenance after shop operation

Chinese Taishan Cruise ship – take over and docking

China Taishan, Ship characteristics

  • Tonnage:  24427 GRT
  • Length: 180.70m
  • Beam:  25.60m
  • Capacity:  927 passengers and 353 crew.

Porject details

  • Onsite check the IT hardware and system when ship hand-over at Italy
  • Discuss with the ship previous owner to get more details
  • Rebuild the ship network infrastructure at ship yard.
  • Rebuild the WiFi network coverage for the passenger area
  • Work with SPMS vendor to rebuild the core system (Fidelio)
  • Satellite communication and TV
  • Casino system management module
  • Internet cafe billing system
  • System maintenance after ship operation

MV Henna – Vessel Take over and docking

MV Henna, Ship Characteristics

  • Tonnage: 47262 GRT
  • Length: 224m
  • Beam: 28.20m
  • Capacity: 1486 passengers, 670 crew.

Project details.

  • Onsite survey and Evaluation before ship hand-over
  • Reconfigure the network and WiFi
  • Rebuild the system database for the SPMS (Fidelio)
  • Rebuild the satellite communication
  • Expand WiFi coverage for the passenger area.
  • Install and deploy Point of Sales system
  • Install and deploy AMOS, System Operation Maintenance

MV Piano Land Take over and docking

MV Piano Land. Ship characteristics

  • Tonnage: 69153 GRT
  • Length: 260m
  • Beam: 32.20m
  • Capacity: 1928 passenger. 794 crew.

Project details

  • Site survey & Evaluation before ship hand over
  • Network design and system implementation
  • Satellite communication
  • WiFi recovery and configuration
  • VLAN configuration and optimization
  • Satellite TV and IPTV/VOD
  • SMPS provider (Resco distributor in China)
  • Onsite survey before ship hand over, IT take over and Implementation

Hello Mriner!

Welcome to Vessel IT, We specialize in providing tailored IT solutions for commercial vessels, cruise ships and ro-ro ferry, ensuring seamless connectivity and efficient operations at sea. Our services enhance vessel performance, safety and communication with cutting-edge technology!